Helicopter Lifting · Safety and compliance

Certificates, numbers and the process behind them

Parker Aero holds a CASA Air Operator's Certificate for aerial work including external load operations. Below are the certificate numbers, insurance limits, our documented planning process and our safety record. Procurement teams can take the whole pack in one download.

CASA AOC
AOC-1-2384719
Aviation liability
$50,000,000
Sling hours flown
18,400
Lost time injuries
0
01

Approvals

CASA Air Operator's Certificate

Certificate holder
Parker Aero Pty Ltd
AOC number
AOC-1-2384719
Authorisation
Aerial work — external load (sling)
Regulation
CASR Part 133 · Part 138
ARN
1064823
Base
Archerfield Airport, QLD
Types on certificate
AS350 / H125 · UH-60
Last CASA surveillance
2026-02-11

External load operations are conducted under CASR Part 133 with approved procedures in our Operations Manual covering human external cargo exclusion, load release systems, exclusion zone management and operations over populous areas.

Each task is authorised individually. The pilot in command signs the load plan against calculated performance for the day, and holds authority to stop or refuse any lift. That authority is not commercial and is never overridden.

Certified copies of the AOC and Operations Manual extracts are supplied with tender responses.

02

Certification

ISO certifications and certificate numbers

ISO 9001:2015

Quality management — aerial lifting operations and planning

Certificate
QMS-AU-104772
Body
SAI Global
Valid to
2027-05-30
ISO 45001:2018

Occupational health and safety management

Certificate
OHS-AU-104773
Body
SAI Global
Valid to
2027-05-30
ISO 14001:2015

Environmental management — noise, fuel handling, sensitive areas

Certificate
EMS-AU-104774
Body
SAI Global
Valid to
2027-05-30
03

Insurance

Cover and limits

PolicyLimitInsurerExpiry
Aviation liability (third party)$50,000,000QBE Aviation2027-01-31
Cargo and slung load liability$10,000,000QBE Aviation2027-01-31
Hull — per aircraft$8,500,000QBE Aviation2027-01-31
Public and products liability$20,000,000Allianz2026-11-30
Workers compensationStatutory · WorkCover QLDWorkCover Queensland2026-06-30
Professional indemnity$5,000,000Allianz2026-11-30

Certificates of currency are issued on request, and principals can be named as interested parties where a contract requires it. Higher liability limits can be arranged for specific contracts on notice.

04

Process

SWMS and JSA, from enquiry to sign-off

01

Enquiry and desktop review

Load weight, dimensions, lifting points, address and access are recorded. We check airspace, terrain, populous area status and obstacle environment before quoting.

02

Site assessment

For rooftops, live plant, over-water tasks and loads near hook capacity we attend site, photograph approaches, measure the exclusion zone and confirm laydown positions.

03

SWMS issued

A Safe Work Method Statement specific to the task covers downwash, exclusion zone control, hook-up and release, load release failure, communications loss and emergency landing areas.

04

JSA on the morning

A Job Safety Analysis is completed on site with all parties before the first pick, against the conditions of the day, and signed by the pilot in command and the loadmaster.

05

Pre-flight brief

Every person inside the exclusion zone attends: frequencies, hand signals, abort calls, load path, ground positions, and who has authority to stop the lift. Anyone can call a stop.

06

Load plan sign-off

Performance is calculated for temperature, elevation, fuel state and working radius. Rigging is inspected and load cell zeroed. The pilot in command signs before launch.

07

Operations and monitoring

Load cell telemetry, fuel state and cycle times are monitored throughout. Weather is reassessed each cycle. Stand-down criteria are agreed in writing before the first pick.

08

Close-out and record

Loads placed, cycles flown, hours and any occurrence are documented and issued to the client. Photographs and the signed JSA form part of the record.

Documents are issued before mobilisation, not on the day. If your principal contractor requires them on a specific template or through a specific portal, tell us at enquiry and we will meet it.

05

Crew

Pilot experience and currency

Pilot minimum total hours
3,500
Pilot minimum sling hours
1,200
Chief pilot total hours
9,600
Recurrent training
6 monthly
Line checks
Annual
Dogging / rigging tickets
100%
Max duty period
12 hrs
Loadmasters on strength
6

Every pilot flying external loads for us holds a current Commercial Pilot Licence (Helicopter), a sling endorsement, and recurrent training on type including vertical-reference long line work.

Loadmasters and ground riggers hold dogging or rigging tickets appropriate to the load, plus our internal exclusion zone and hook-up competency. Competency records are maintained in the pack.

Fatigue is managed under a documented scheme with hard limits on duty and flight time. A long regional day ends when the scheme says it ends.

06

Record

Safety performance

Sling hours flown
18,400Since 2011
External loads placed
26,700
Lost time injuries
0
Reportable accidents
0
Load releases (unplanned)
0
Client audits passed
34
CASA findings, last audit
0
Occurrences reported
11All investigated and closed

We report and investigate every occurrence, including near misses with no damage, under our Safety Management System. Findings and corrective actions are available to clients on request for the periods relevant to their work.

07

Procurement

Download the compliance pack

  • 01CASA Air Operator's Certificate
  • 02Operations Manual extract — external load procedures
  • 03ISO 9001, 45001 and 14001 certificates
  • 04Certificates of currency for all policies
  • 05Generic SWMS — helicopter external load operations
  • 06JSA template and pre-flight brief record
  • 07Emergency response and site communications plan
  • 08Pilot licences, endorsements and sling hours summary
  • 09Rigging register with inspection dates
  • 10Safety performance summary and occurrence history
  • 11Environmental management plan — noise, fuel, sensitive areas
  • 12Company details, ABN and insurance broker contacts

Compliance pack · procurement

Twelve documents in one pack: AOC, ISO certificates, certificates of currency, SWMS and JSA templates, rigging register and safety performance summary. Tell us where to send it.

We use your details to send the pack and nothing else. No list, no newsletter.

Next step

Send the scope. Documents follow before the aircraft does.