Every lift, as flown
Load weights, aircraft, time on site and what the ground alternative would have cost.
Project register
Filed projects
Showing 12 of 12 projects

PA-2614 · 2025-03-16
Rooftop chiller replacement, Brisbane CBD
Two 580 kg chiller modules swapped on a 14-storey plant deck inside a single Sunday window, with no street closure.
580 kg · 20 min on site

PA-2588 · 2025-01-28
Water tank placement, Moreton Island
Six poly tanks and a pump skid placed at an island resort with no barge window and no vehicle access to the ridge.
740 kg · 2.6 hrs on site

PA-2571 · 2024-11-09
Spa placement over a hinterland home
A 620 kg acrylic spa flown over a two-storey home into a rear deck with a 3.2 m gate and no side access.
620 kg · 0.6 hrs on site

PA-2552 · 2024-09-22
Transmission pole change-out, Darling Downs
Eleven concrete poles replaced across cropped paddocks without a single machine track through standing sorghum.
620 kg · 6.4 hrs on site

PA-2536 · 2024-07-14
Tower sections to a ridgeline site, Far North
Six lattice sections and a headframe flown to a 780 m ridge where the access track had washed out.
760 kg · 3.2 hrs on site

PA-2519 · 2024-05-19
Steel trusses over a live retail centre
Nine roof trusses set over a trading shopping centre between closing time and the morning delivery run.
640 kg · 2.1 hrs on site

PA-2498 · 2024-03-08
Conveyor modules into a live plant, Mount Isa
Nine conveyor module sections placed inside an operating processing plant during a scheduled 12 hour shutdown.
760 kg · 4.8 hrs on site

PA-2477 · 2023-11-02
Resort air conditioning swap, Whitsundays
Fourteen condensers rotated across island villa roofs in a single day between guest departures and arrivals.
410 kg · 5.4 hrs on site

PA-2461 · 2023-08-30
Tracker frames across a solar farm, Capricornia
Pre-assembled tracker frames distributed across a 320 ha solar farm without a single haul road extension.
760 kg · 7.2 hrs on site

PA-2440 · 2023-02-04
Cyclone response, roof plant and debris, Townsville
Emergency removal of failed roof plant and delivery of temporary generators 36 hours after a category three crossing.
620 kg · 5.1 hrs on site

PA-2418 · 2022-10-11
Pedestrian bridge beams over a creek, Wide Bay
Two 760 kg beams set across a protected creek where no crane pad could be built on either bank.
760 kg · 1.8 hrs on site

PA-2399 · 2022-06-21
Concrete placement to a ridge-top slab
Sixty-two skip cycles of concrete flown to a ridge-top slab a pump could not reach.
620 kg · 4.4 hrs on site
Get your price range in a minute
Tell us the load and the site. You see an indicative range before we ask for your details. From $14,000 plus GST.
Request a liftReady to book a lift?
Get an indicative price in about a minute, then a written quote.