Powerline & Utility Helicopter Lifting in Queensland
The easement is the access. Poles hardware set and stringing supported in about 20 minutes of flight time along corridors a truck cannot follow.

The problem
Why this lift is hard the conventional way
Transmission and distribution corridors run straight through country that has no road: escarpments, cane, wetland and flood plain.
- Building access tracks costs more than the asset and triggers approvals.
- Wet-season ground conditions strand plant for months.
- Outage windows are short and fixed, a bogged truck loses the window.
- Environmental conditions restrict clearing along many easements.
How we do it
Aircraft, rigging, crew and duration
- Aircraft
- AS350, working maximum 800 kg on the hook
- Rigging method
- Long line, pole-setting cradle, remote hook, ground-crew tag lines
- Crew
- Pilot, loadmaster, two linesmen-riggers, corridor spotter
- Typical duration
- Full day tasking, sequenced structure by structure, about 20 minutes flight time per structure
- Corridor survey with structure list, weights and coordinates.
- Outage window and network operator approvals confirmed.
- Fuel and lay-down point established at the nearest trafficable access.
- Sequential flights along the corridor, hot refuel between blocks.
Typical loads
What we lift, what it weighs, what it takes
| Item | Weight range | Aircraft | Typical time |
|---|---|---|---|
| Timber pole hardware kit | 300–650 kg | AS350 | 10 min |
| Cross-arm assembly | 120–400 kg | AS350 | 5 min |
| Insulator and hardware pallet | 200–500 kg | AS350 | 8 min |
| Small transformer | 400–780 kg | AS350 | 12 min |
| Conductor reel (partial) | 300–600 kg | AS350 | 10 min |
Indicative only. Working payload reduces with radius, temperature and density altitude; every load is confirmed against the day's conditions.
Get your price range in a minute
Tell us the load and the site. You see an indicative range before we ask for your details. From $14,000 plus GST.
Request a liftRelated work
Lifts we have flown
650 kg
Escarpment hardware replacement
Nine structures serviced across a range face in one outage window, each cycle around 12 minutes.
Toowoomba & Darling Downs · AS350
600 kg
Flood plain rebuild
Ground saturated for six weeks post-event; the corridor was flown, not driven, loads split into manageable lifts.
Wide Bay · AS350
320 kg
Cane-country cross-arms
Thirty-one assemblies delivered without a single crop crossing.
Mackay & Whitsundays · AS350
Site requirements
What you need ready on the day
- Confirmed outage and network operator permit for the window.
- Structure list with certified weights and GPS coordinates.
- Trafficable lay-down and refuelling point within corridor range.
- Linesmen on structure trained for helicopter-delivered loads.
- Landholder access agreements along the corridor.
Cost factors
What moves the number
Structures per day
Corridor work is priced by the day; sequencing determines value.
Corridor remoteness
Ferry and fuel logistics dominate cost beyond Rockhampton.
Outage constraints
Narrow windows require standby aircraft and crew.
Load class
Heavier hardware is split into multiple AS350 cycles rather than a single heavy lift.
Questions
Powerline & utility lifting, frequently asked
Coverage
Where we fly this work
We provide powerline & utility lifting across Brisbane, Gold Coast, Sunshine Coast, Toowoomba & Darling Downs, Wide Bay, Rockhampton & Capricorn Coast, Mackay & Whitsundays, Townsville, Cairns & Far North Queensland, Mount Isa & North West Queensland, Moreton Bay & Islands and everywhere else in Queensland, mobilising from 18 min in Brisbane to 5.8 hours in the North West.