Skip to content
HELICOPTER LIFTINGpowered by Parker Aero
HVAC & rooftop plant lifting operations in Queensland

Helicopter Lifting · Parker Aero

HVAC & Rooftop Plant Lifting in Queensland

Old unit out, new unit in, same morning. Rooftop plant replacement without closing a lane of traffic or standing a 200-tonne crane in the loading dock.

02

The problem

Why this lift is hard the conventional way

Rooftop plant sits at the worst possible place for a crane: high, set back from the parapet, and above a street you cannot close.

  • Boom reach over a parapet demands a very large, very expensive crane.
  • CBD standing space requires lane closures, traffic management and police.
  • Tenants and retail below cannot be disrupted during business hours.
  • A failed chiller is an emergency; a crane booking is not.
03

How we do it

Aircraft, rigging, crew and duration

Aircraft
Airbus H125 for units to 1,000 kg; Black Hawk beyond
Rigging method
40 m long line, remote release hook, four-leg sling set
Crew
Pilot, loadmaster, rooftop rigging pair, street-level controller
Typical duration
60–120 minutes on task for a swap-out
  1. 01Structural check of the roof landing point and crane-free route to plinth.
  2. 02Old unit isolated, disconnected and pre-rigged by your mechanical contractor.
  3. 03Exclusion zone over the street or forecourt, held by marshals.
  4. 04Removal flight, then placement flight; unit landed onto anti-vibration mounts.
04

Typical loads

What we lift, what it weighs, what it takes

ItemWeight rangeAircraftTypical time
Split system condenser80–260 kgH1253 min/cycle
Air handling unit400–900 kgH12510 min
Packaged chiller900–2,400 kgH125 / Black Hawk14 min
Cooling tower1,200–3,000 kgBlack Hawk18 min
Exhaust fan array150–500 kgH1255 min/cycle

Indicative only. Working payload reduces with radius, temperature and density altitude; every load is confirmed against the day's conditions.

05

The Lift Envelope

Check a hvac & rooftop plant lifting job in 60 seconds

Lift calculator
05 questions · ~30 sec · no contact details

Answer 5 questions. Find out if your lift flies — and what it costs.

Enter the load, the weight, the region and the site access. The instruments on the right update live, and you get a written estimate you can download.

  1. 01Can it be flownfeasibility verdict
  2. 02Which aircrafthook capacity match
  3. 03What it costsindicative $ range
Start below — question 02 of 05

Question 02 of 05How heavy?

40% complete

Question 2 of 5: How heavy?

How heavy?

1,180kg

HVAC or rooftop plant — hook capacity across the fleet runs to 4,000 kg.

Payload vs hook

AT 20 m
Airbus H125EXCEEDS HOOK
1,180 kg / 863 kg
Black Hawk32% OF HOOK
1,180 kg / 3,699 kg

Airbus H125

Hook 1,000 kg

EXCEEDS HOOK

118% of hook

Black Hawk

Hook 4,000 kg

GO

30% of hookRecommended

Your result — pending
  • Feasibility— — —
  • Recommended aircraft— — —
  • Indicative price range— — —

Answer all 05 questions to release the readout.

06

Related work

Lifts we have flown

1,180 kg

Chiller replacement, 22-storey tower

Crane quote required a two-day lane closure. Flown in a 90-minute Sunday window instead.

BrisbaneH125
760 kg

Hospital AHU array

Six units exchanged over a live emergency department with zero ground disruption.

TownsvilleH125
2,800 kg

Shopping centre cooling towers

Two towers replaced before trading hours; car park reopened by 09:00.

Gold CoastBlack Hawk
07

Site requirements

What you need ready on the day

01Structural sign-off for the roof landing and plinth positions.
02Plant isolated, drained and disconnected before the window.
03Certified lifting lugs or an approved sling arrangement on each unit.
04Ground-level exclusion zone with marshals and building notification.
05Roof access for our rigging pair and a safe working platform at the plinth.
08

Cost factors

What moves the number

Unit weight

Crossing 1,000 kg moves the task to the Black Hawk.

Number of units

Batching swaps into one mobilisation is the single biggest saving.

Building height and setback

Longer lines and tighter parapets add cycle time.

Window timing

Out-of-hours windows attract standby, not premium flight rates.

See full pricing structure →
09

Questions

HVAC & rooftop plant lifting — frequently asked

Next step

Tell us what needs lifting.