Construction lifting operations in Queensland

Helicopter Lifting · Parker Aero

Construction Helicopter Lifting in Queensland

Keep the tower crane on the critical path. We take the awkward picks — the ones that need reach, a weekend window, or a street you cannot close.

02

The problem

Why this lift is hard the conventional way

On a live construction site the crane is the bottleneck. Every pick that needs extra reach, an out-of-hours window or a closed footpath compounds the programme.

  • Tower crane hours are the scarcest resource on the job.
  • Mobile crane standing space often does not exist in an inner-city footprint.
  • Out-of-hours street closures attract permits, police and noise conditions.
  • Late design changes leave loads stranded once the crane is dismantled.
03

How we do it

Aircraft, rigging, crew and duration

Aircraft
Black Hawk for steel and precast, H125 for lighter runs
Rigging method
Long line with tag lines, load cell and calibrated slings
Crew
Pilot, loadmaster, two riggers, plus your crane crew on deck
Typical duration
Two to five hours on task for a typical steel package
  1. 01Pick list and weights reconciled against certified sling capacity.
  2. 02Deck plan, lay-down area and hover path agreed with your site manager.
  3. 03Toolbox with all trades, exclusion zone stood up, radio check.
  4. 04Sequenced picks flown continuously; loads landed onto pre-set packers.
04

Typical loads

What we lift, what it weighs, what it takes

ItemWeight rangeAircraftTypical time
Steel beams and trusses800–3,400 kgBlack Hawk10 min
Precast panels1,500–3,800 kgBlack Hawk14 min
Formwork and props300–800 kgH1255 min/cycle
Rooftop plant deck600–1,000 kgH12512 min
Scaffold bundles400–900 kgH1254 min/cycle

Indicative only. Working payload reduces with radius, temperature and density altitude; every load is confirmed against the day's conditions.

05

The Lift Envelope

Check a construction lifting job in 60 seconds

Lift calculator
05 questions · ~30 sec · no contact details

Answer 5 questions. Find out if your lift flies — and what it costs.

Enter the load, the weight, the region and the site access. The instruments on the right update live, and you get a written estimate you can download.

  1. 01Can it be flownfeasibility verdict
  2. 02Which aircrafthook capacity match
  3. 03What it costsindicative $ range
Start below — question 02 of 05

Question 02 of 05How heavy?

40% complete

Question 2 of 5: How heavy?

How heavy?

2,200kg

Structural steel — hook capacity across the fleet runs to 4,000 kg.

Payload vs hook

AT 20 m
Airbus H125EXCEEDS HOOK
2,200 kg / 863 kg
Black Hawk59% OF HOOK
2,200 kg / 3,699 kg

Airbus H125

Hook 1,000 kg

EXCEEDS HOOK

220% of hook

Black Hawk

Hook 4,000 kg

GO

55% of hookRecommended

Your result — pending
  • Feasibility— — —
  • Recommended aircraft— — —
  • Indicative price range— — —

Answer all 05 questions to release the readout.

06

Related work

Lifts we have flown

2,100 kg

Roof truss set, hillside build

No crane pad on a 1:4 slope. Fourteen trusses set in one 3-hour window.

Sunshine CoastBlack Hawk
3,300 kg

Weekend steel package

Beachfront site with no road closure available. Package flown Sunday 06:00–09:00.

Gold CoastBlack Hawk
980 kg

Plant room retrofit

Tower crane already dismantled; six units delivered to level 22.

BrisbaneH125
07

Site requirements

What you need ready on the day

01Certified weights for every load, plus lifting points or slings.
02Cleared deck and lay-down area with exclusion zone marshals.
03Site induction completed for our crew ahead of lift day.
04Trades stood down under the flight path for the duration.
05Approved out-of-hours works notice if the window falls outside standard times.
08

Cost factors

What moves the number

Pick count and sequence

Continuous cycles are the cheapest way to buy aerial crane time.

Load weight

Anything above 1,000 kg moves the job onto the Black Hawk.

Window constraints

Weekend and early-morning windows need standby crew.

Site congestion

Tight decks lengthen cycle times and require additional ground crew.

See full pricing structure →
09

Questions

Construction lifting — frequently asked

Next step

Tell us what needs lifting.