Mining & resources lifting operations in Queensland

Helicopter Lifting · Parker Aero

Mining & Resources Helicopter Lifting in Queensland

Downtime is the cost. When a shutdown is running hot, the aircraft moves the component the crane cannot get to in time.

02

The problem

Why this lift is hard the conventional way

On a resources site the value of a lift is measured against production lost per hour. Conventional access is slow precisely when speed is worth the most.

  • Crane mobilisation to remote pits and camps takes days.
  • Haul road movements interrupt production and require escorts.
  • Shutdown windows are fixed; overruns cascade through the schedule.
  • Exploration and pipeline corridors often have no formed access at all.
03

How we do it

Aircraft, rigging, crew and duration

Aircraft
Black Hawk primary, H125 for lighter site support
Rigging method
Heavy long line, load cell, engineered spreader sets
Crew
Pilot, loadmaster, two riggers, site-inducted ground controller
Typical duration
Day-rate tasking, sequenced to your shutdown plan
  1. 01Scope reconciled against your shutdown or exploration programme.
  2. 02Site induction, permit to work and radio protocols established.
  3. 03Fuel and lay-down secured on site, hot refuel where approved.
  4. 04Tasking flown to the schedule, with contingency loads pre-rigged.
04

Typical loads

What we lift, what it weighs, what it takes

ItemWeight rangeAircraftTypical time
Conveyor idler frames300–1,100 kgH1256 min/cycle
Pipeline section900–3,200 kgBlack Hawk14 min
Exploration drill module1,400–3,600 kgBlack Hawk16 min
Pump and skid package800–2,800 kgBlack Hawk14 min
Camp and supply pallets300–900 kgH1255 min/cycle

Indicative only. Working payload reduces with radius, temperature and density altitude; every load is confirmed against the day's conditions.

05

The Lift Envelope

Check a mining & resources lifting job in 60 seconds

Lift calculator
05 questions · ~30 sec · no contact details

Answer 5 questions. Find out if your lift flies — and what it costs.

Enter the load, the weight, the region and the site access. The instruments on the right update live, and you get a written estimate you can download.

  1. 01Can it be flownfeasibility verdict
  2. 02Which aircrafthook capacity match
  3. 03What it costsindicative $ range
Start below — question 02 of 05

Question 02 of 05How heavy?

40% complete

Question 2 of 5: How heavy?

How heavy?

2,200kg

Structural steel — hook capacity across the fleet runs to 4,000 kg.

Payload vs hook

AT 20 m
Airbus H125EXCEEDS HOOK
2,200 kg / 863 kg
Black Hawk59% OF HOOK
2,200 kg / 3,699 kg

Airbus H125

Hook 1,000 kg

EXCEEDS HOOK

220% of hook

Black Hawk

Hook 4,000 kg

GO

55% of hookRecommended

Your result — pending
  • Feasibility— — —
  • Recommended aircraft— — —
  • Indicative price range— — —

Answer all 05 questions to release the readout.

06

Related work

Lifts we have flown

2,900 kg

Shutdown conveyor components

Component set placed inside a 6-hour window, avoiding a 14-hour haul road movement.

Mackay & WhitsundaysBlack Hawk
1,700 kg

Exploration camp establishment

Full camp and drill support flown to a site with no formed access.

Mount Isa & North WestBlack Hawk
2,400 kg

Pipeline crossing sections

Eleven sections placed along a gully crossing over two days.

RockhamptonBlack Hawk
07

Site requirements

What you need ready on the day

01Site induction and permit to work completed for our crew.
02Nominated exclusion zones cleared of personnel and light vehicles.
03Certified weights, lifting points and engineered rigging plan.
04Approved fuel storage or refuelling arrangement on or near site.
05Radio channel and ground controller for the duration of tasking.
08

Cost factors

What moves the number

Distance from base

Bowen Basin and North West tasking carries significant ferry time.

Days on site

Multi-day tasking spreads mobilisation across far more lifts.

Payload class

Most resources loads sit on the Black Hawk.

Standby requirements

Aircraft held for a shutdown contingency is billed at a standby rate.

See full pricing structure →
09

Questions

Mining & resources lifting — frequently asked

Next step

Tell us what needs lifting.