Rooftop chiller replacement, Brisbane CBD

Two 580 kg chiller modules swapped on a 14-storey plant deck inside a single Sunday window, with no street closure.

PA-2614 · Turbot Street, Brisbane CBD · 2025-03-16

The constraint

Why this lift needed a helicopter

The plant deck sat 14 storeys up behind a parapet, set back 9 m from the building line.

The only crane position was a two-lane arterial requiring a full weekend closure and traffic management.

Building management could not surrender tenant access on a weekday, and the chillers were already failing.

The lift

How it was flown

Load weight
580 kg
Aircraft
AS350
Line length
45 m
Crew
6
Exclusion zone
60 m
Lift cycles
4
  1. Flew from Archerfield with a 45 m long line and remote hook, staging the replacement units on a closed carpark deck two blocks north.
  2. Old units were cut free, rigged and flown out first so the deck was clear before the new plant arrived.
  3. Riggers on the roof worked inside a marked 60 m exclusion zone under a dedicated ground controller on a discrete frequency.
  4. Four cycles total: two out, two in, with the deck signed off before the CBD reopened on Monday.

The numbers

Time, cost and disruption

Helicopter time on site
20 min
Flight time
0.8 hrs
Crane alternative
3 days · $41,500 – $55,500
Road closures
0

Also filed

More projects

  • Water tank placement, Moreton Island, helicopter aerial crane lift at Eastern ridge, Moreton Island, Queensland

    PA-2588 · 2025-01-28

    Water tank placement, Moreton Island

    Six poly tanks and a pump skid placed at an island resort with no barge window and no vehicle access to the ridge.

    740 kg · 2.6 hrs on site

  • Spa placement over a hinterland home, helicopter aerial crane lift at Tallai, Gold Coast hinterland, Queensland

    PA-2571 · 2024-11-09

    Spa placement over a hinterland home

    A 620 kg acrylic spa flown over a two-storey home into a rear deck with a 3.2 m gate and no side access.

    620 kg · 0.6 hrs on site

  • Transmission pole change-out, Darling Downs, helicopter aerial crane lift at Cambooya, Darling Downs, Queensland

    PA-2552 · 2024-09-22

    Transmission pole change-out, Darling Downs

    Eleven concrete poles replaced across cropped paddocks without a single machine track through standing sorghum.

    620 kg · 6.4 hrs on site

Ready to book a lift?

Get an indicative price in about a minute, then a written quote.

Call 0418 878 707Request a lift