Resort air conditioning swap, Whitsundays
Fourteen condensers rotated across island villa roofs in a single day between guest departures and arrivals.
PA-2477 · Island resort, Whitsundays · 2023-11-02

The constraint
Why this lift needed a helicopter
Villas were spread along 1.8 km of vegetated foreshore with buggy paths only.
Roof pitch and setbacks ruled out any wheeled or tracked lifting plant.
The resort had one changeover day with no guests in residence.
The lift
How it was flown
- Load weight
- 410 kg
- Aircraft
- AS350
- Line length
- 30 m
- Crew
- 5
- Exclusion zone
- 40 m
- Lift cycles
- 28
- A single laydown was established beside the maintenance shed for all new and removed units.
- Units were flown in pairs of cycles per villa: old out, new in, before moving along the foreshore.
- Trades followed the aircraft villa by villa so commissioning finished the same evening.
The numbers
Time, cost and disruption
- Helicopter time on site
- 5.4 hrs
- Flight time
- 3.1 hrs
- Crane alternative
- Not achievable · no crane access to villa roofs
- Road closures
- 0
On site
Photos
Also filed
More projects

PA-2614 · 2025-03-16
Rooftop chiller replacement, Brisbane CBD
Two 580 kg chiller modules swapped on a 14-storey plant deck inside a single Sunday window, with no street closure.
580 kg · 20 min on site

PA-2588 · 2025-01-28
Water tank placement, Moreton Island
Six poly tanks and a pump skid placed at an island resort with no barge window and no vehicle access to the ridge.
740 kg · 2.6 hrs on site

PA-2571 · 2024-11-09
Spa placement over a hinterland home
A 620 kg acrylic spa flown over a two-storey home into a rear deck with a 3.2 m gate and no side access.
620 kg · 0.6 hrs on site
Ready to book a lift?
Get an indicative price in about a minute, then a written quote.