Skip to content
HELICOPTER LIFTINGpowered by Parker Aero
Aerial view of the Wide Bay region, Queensland

Helicopter Lifting · Parker Aero

Helicopter Lifting in Wide Bay — Bundaberg and Hervey Bay

Cane country, coastal towns and an island with no bridge. Wide Bay work runs from processing-plant changeouts to K'gari resort logistics that no barge schedule can match.

Mobilisation
1.4hrs to task
Service radius
200km
Hook capacity
4,000kg max
02

Coverage

Where we fly around Wide Bay

Suburbs and localities served

  • Bundaberg
  • Bargara
  • Childers
  • Gin Gin
  • Hervey Bay
  • Urangan
  • Maryborough
  • Tin Can Bay
  • Rainbow Beach
  • K'gari (Fraser Island)
  • Gympie
  • Woodgate

Local government areas

  • 01Bundaberg Regional Council
  • 02Fraser Coast Regional Council
  • 03North Burnett Regional Council
  • 04Gympie Regional Council
Departure base
Bundaberg Airport / Hervey Bay Airport
Mobilisation from base
1.4 hrs transit
Typical response window
48 hours standard, 3–5 days for island tasking
Typical on-site duration
1.5 day(s) per mobilisation
Aircraft available
H125 · 1,000 kg hook · UH-60 · 4,000 kg hook
04

Local operating considerations

What actually governs a lift in Wide Bay

Airspace, weather, terrain and approvals decide whether a lift flies — not the hook rating. This is the operating picture we plan every Wide Bay task against.

01

K'gari access and sand-island constraints

K'gari has no bridge, a barge timetable governed by tides, and beach 'roads' that close on a high tide or after rain. Aerial delivery removes the tide dependency entirely, but the island is a World Heritage area — landing points are limited, dingo-safe ground procedures apply, and we coordinate with QPWS before any tasking.

02

Salt air and corrosion on coastal plant

Coastal Wide Bay plant fails early from salt attack, so changeouts are more frequent and often urgent. We plan rigging with the assumption that lifting lugs on an old coastal unit may be compromised, and we verify or replace attachment points before the aircraft is committed.

03

Cyclone and flood season, November to April

The Burnett floods hard and fast. In an event, road access to Gin Gin, Childers and rural Bundaberg can be cut for days, and aerial resupply becomes the only option. Outside events, the same season brings the marginal-weather days that push non-urgent bookings.

04

Cane harvest and burning windows

From June to December, cane harvest traffic, haul-out machinery and residual smoke from burns affect both ground access and visibility. We schedule around harvest activity on the mill's block program rather than turning up and negotiating on the day.

05

Over-water flight profiles

Anything crossing to K'gari or working the Great Sandy Strait is planned as an over-water task: flotation-equipped aircraft, life jackets for all on board, a defined ditching plan and a load that can be jettisoned clear of vessels and shoreline.

05

Projects in this region

Lifts we have flown here

1,600 kg

Resort water tanks, K'gari east coast

Four tanks flown in over the strait; barge alternative was tide-locked for nine days.

K'gariUH-60
2,900 kg

Mill drive unit changeout, Bundaberg

Crush-season shutdown; component in and out inside a four-hour maintenance window.

BundabergUH-60
620 kg

Flood reinstatement, Gin Gin

Pole and transformer delivery to isolated properties while the roads were still under water.

Gin GinAS350 B3
06

Service radius

200 km of working radius

WIDE BAY200 KM RADIUS
Base
Bundaberg Airport / Hervey Bay Airport
Working radius
200 km
Centre
-25.288, 152.846
LGAs served
4

Schematic only. We operate statewide — the radius shows the area typically covered from this base without additional fuel staging.

07

Questions

Wide Bay — frequently asked

Next step

Tell us what needs lifting in Wide Bay.

Airborne in 1.4 hours from Bundaberg Airport / Hervey Bay Airport.